The planning sectors of Polígono Industrial de Granadilla, as shown in the general plan, are the following:
Urban ground
1 - Energy Activities Area - EA2:
- Gas factory (1994)
- Fuel park (2014)
- Power plant (1994)
2 - Sectors already urbanized:
- SP2.01, Industrial parc. (2001)
- SP2.02, industrial parc. (2005)
3 - Sector of Renewable Energy Technological Institute (1995)
- ITER facilities (1995)
- Wind farms (1996)
- Photovoltaic farms (2000)
- Technological park (2009)
Soil in the process of urbanization:
1 - Central Sector - SP1.01 (2012)
2 - Tenerife Technology Park Sector - SP1.02 (2013)
3 - Sector of the Granadilla Port coastline - SP3 (2010)